Color: Vert foncé
How does preordering work?
Basically, it means you buy the garment before it’s produced. By pre‑ordering, you’re the one launching the production.
With this system, we only produce what’s sold, so we avoid overproduction and can offer you an excellent quality‑price ratio.
Here’s a detailed breakdown:
Environmental and social impact
0
The equivalent of 130.2 km (80.9 miles) by car.
0
The equivalent of growing 19 kg of apples.
0
The equivalent of 26.4 h of heating (in avg. flat).
All production steps for your Merino T-Shirt
What goes into making your Merino T-Shirt. The materials have travelled a total of 24,800 km (15,410 miles) from field to doormat.
Harvesting and preparing the merino wool
Farming cooperatives Argentina
Spinning
Tollegno 1900 Poland Sp Zoo Poland
Dyeing
Filatura Tollegno 1900 Srl. Italy
Knitting
NGS MALHAS Portugal
Garment make
Irmaos Rodrigues Portugal
Transport
Par camion